Reduction of overengineering, through requirement specifications, as well as project controlling, clear project process initiated, (reduction of cost variance -20%)
Post-calculations introduced as a tool (+30% effectiveness)
After-sales set up with EBIT effectiveness (+30% sales)
Correction of inventories with regard to recoverability
Recruitment of suitable candidates off the beaten track